Solar Power Plants

BH Bandai 2 Power Plant (2,688.00 kW)

Fukushima Prefecture, Yama District, Inawashiro Town, Koshinuma, Ojizawa, Ishigou 2370-31, among other locations


DATA

[ Location ] Fukushima Prefecture, Yama District, Inawashiro Town, Koshinuma, Ojizawa, Ishigou 2370-31, among other locations
[ Site Area ] 70,340.00 sqm
[ Operation Start Date ] Sep. 2019
[ Panel Output ] 2,688.00 kW
[ Panels ] 8960 panels
[ Power Conditioners ] 60 units
[ Construction Company ] Blue Power Construction Co., Ltd.